Name:
Email:
Slideshow Image 1
Slideshow Image 2
Slideshow Image 3
Slideshow Image 4
Home Applications Case Studies LGSF - Lightweight Flooring

LGSF Lightweight Flooring selected for ARCO Distribution Centre:

Print E-mail

 

In order to create additional space following relocation, ARCO turned to the project team to provide a lightweight mezzanine floor offering a 5kN/m2 loading capacity together with additional welfare facilities within a short project timeframe, for their flagship distribution centre at Blaydon. In turn, the project team commissioned Light Gauge Steel Framing (Sherburn) to supply and install the new mezzanine by providing a total solution of pre-assembled 150mm deep floor frames supported on hot-rolled structural posts, plus canteen, office and toilet facilities created using studded load-bearing wall panels assembled using 100mm and 75mm channel sections.

All lightweight framing was detailed on Vertex BD software and manufactured on Howick roll-forming machines.


© LGSF 2009

 
  orange-bullet Case Studies
  orange-bullet Contact Us
  orange-bullet Photo Gallery
  orange-bullet Russian Website
  orange-bullet Design/Manufacture Service
 2011 Howick Brochure        
  orange-bullet  Download PDFbrochure

video

videotext

Next Trade Shows:

Modular Building Expo
9 – 11 March
Guangzhou,
China
Booth H083

Howick Innovation Conference
21 – 23 March
Auckland,
New Zealand
© 2011 Howick Ltd. | Sales Contact | Eco Statement | Links | Sitemap | Webmail | Download | Imap
youtube linkdl facebook