Offsite construction of cold formed steel panels increases onsite efficiency.
The panels were fabricated offsite to exact dimensions, then shipped to site for easy installation.
Prefabricated panels, manufactured on Howick FRAMA™ 5600 and FRAMA™ 3200 roll-forming machines.
Sunset on the constuction site.
The Henrietta Hotel taking shape.
The Henrietta Hotel, complete.